HP0 M15 Quality Center Certification sample Preparation Questions:
1) Quality Center is
– an ERP
– a standalone software
– a web based (client/server) tool
– a script
2) Traceability Alert is depicted with “@” Mark against a Test
– Yes
– No
3) For Test Plan Module , select the correct folder hierarchy
i. Subject – Tests – Test Step
ii. Subject – Test Steps – Step
iii. Requirements – Tests – Test Steps
iv. Requirements – Subject – Tests – Test Steps

4) Which Tab allows to configure conditional execution of Tests
Hint : Conditions like Test # 2 can be executed only if Test # 1 is completed
i. Execution Flow
ii. Design
iii. Attachments
iv. None of The Above

5) Test Cases created in Word / Excel can be uploaded in QC ?
i. Yes
ii. No

6) Types of Graphs available in QC
i. Reports
ii. Graphs
iii. Live Analysis Graphs
iv. All Of the Above
7) Follow Up Alert can be created on
i. A Test in Test Plan Tree
ii. A Test Instance in Execution Grid
iii. A Defect in Defects Grid
iv. All Of the Above

8) Favorites are almost always are High Priority Defects
Hint : User can mark a defect as favorite for easy tracking. A favorite can be PUBLIC or PRIVATE i. Yes
ii. No

9) In QC, Requirements & Test Plan can be linked ?
i. Only Child Requirements
ii. Only Parent Requirements
iii. Both Child & Parent Requirements
iv. Neither Child nor Parent Requirements

10) In Test Lab Module , is it possible to store separate results for the SAME test case run at different dates and times ?
i. Yes
ii. No
11) Which of the Below is NOT a module in Quality Center
i. Requirements
ii. Business Component
iii. Defects
iv. Automation

12) Defect can be linked to
i. Tests & Test Steps
ii. Run & Run Steps
iii. Requirements
iv. All Of the Above

13) Test Cases can be added in Test Lab Module from
i. Requirements Module
ii. Defects Module
iii. Test Plan Module
iv. All Of the Above

14) Data is DYNAMICALLY updated in
i. Reports
ii. Graphs
iii. Live Analysis Graphs
iv. None Of the Above

15) Is is possible to link a single defect to multiple test cases ?
i. Yes
ii. No
iii. MAYBE. Depends on the TYPE of Defect

16) Which Tests can be scheduled to be run at a specific Date and Time ?
i. Manual Test Cases
ii. Automated Test Cases
iii. Both Manual & Automated Test Cases
iv. Neither Manual nor Automated Test Cases

17) In Test Lab Module
i. Tests are created
ii. Tests are executed
iii. Tests are created and executed

18) Results of an AUTOMATED test case are stored in “——-” module of Quality Center
i. Automation
ii. Test Plan
iii. Test Lab
iv. None of The Above

19) An Instance is
i. A copy of the Requirement
ii. A copy of Test Case
iii. A Copy of Defect
iv. A copy of Email

20) Quality Center is a
i. Defect Tracking Tool
ii. Requirements Management Tool
iii. Test Planning Tool
iv. Comprehensive Test Management Tool

Answers:
1) Quality Center is
Correct answer is: a web based (client/server) tool
2) Traceability Alert is depicted with “@” Mark against a Test
Correct answer is: NO
Traceability Alert is depicted with “!” Mark
3) For Test Plan Module , select the correct folder hierarchy
Correct answer is: Subject – Tests – Test Step
4) Which Tab allows to configure conditional execution of Tests
Correct answer is: Execution Flow
5) Test Cases created in Word / Excel can be uploaded in QC ?
Correct answer is: YES
6) Types of Graphs available in QC
Correct answer is: All Of the Above
7) Follow Up Alert can be created on
Correct answer is: All Of the Above
8) Favorites are almost always are High Priority Defects
Correct answer is: NO
Any priority defect can be marked a favorite.
9) In QC, Requirements & Test Plan can be linked ?
Correct answer is: Both Child & Parent Requirements
10) In Test Lab Module , is it possible to store separate results for the SAME test case run at different dates and times ?
Correct answer is: YES
11) Which of the Below is NOT a module in Quality Center
Correct answer is: Automation
12) Defect can be linked to
Correct answer is: All Of the Above
13) Test Cases can be added in Test Lab Module from
Correct answer is: Test Plan Module
14) Data is DYNAMICALLY updated in
Correct answer is: Live Analysis Graphs
15) Is is possible to link a single defect to multiple test cases ?
Correct answer is: YES
Any type of defect can be linked to multiple test cases.
16) Which Tests can be scheduled to be run at a specific Date and Time ?
Correct answer is: Both Manual & Automated Test Cases
17) In Test Lab Module
Correct answer is: Tests are executed
18) Results of an AUTOMATED test case are stored in “——-” module of Quality Center
Correct answer is: Test Lab
19) An Instance is
Correct answer is: A copy of Test Case
A Test Case copied from Test Plan Module to the Test Lab Module is called an instance of that Test Case
20) Quality Center is a
Correct answer is: Comprehensive Test Management Tool